RUAG

04/09/2017RUAG SOON TO FULFIL DORNIER 328 PHASE 4, 6 INSPECTIONS

RUAG Aviation fulfilled the phase four and phase six heavy maintenance check on a Dornier 328 within the highly competitive turnaround time (TAT) of just four weeks. The vast Dornier 328 experience accumulated by RUAG at its Bern-Belp location was a deciding factor for ExecuJet South Africa which awarded the maintenance, repair and overhaul (MRO) contract

06/07/2017RUAG REPAINTS BOMBARDIER GLOBAL EXPRESS XRSWITH UNIQUE AND DETAILED CARBONEUM DESIGN

The aircraft painting facility at the RUAG Aviation one-stop shop in Munich has repainted a Bombardier Global Express XRS, on behalf of long-time customer SBK Holding Ltd. The RUAG one-stop shop services optimised the downtime associated with a scheduled 15-month inspection.

12/06/2017RUAG COMPLETES FIRST C-CHECK ON DASSAULT FALCON 7X

RUAG Aviation announces the successful conclusion of their first heavy maintenance event for a Dassault Falcon 7X. The Dassault Falcon 7X Ccheck was one of three concurrent C-check events at the Dassault Falcon Authorised Service Centre in Geneva

26/04/2017RUAG STREAMLINES TPE331 ENGINE SHOP

Brand new workstations – organized according to lean management principles – together with new processes, ensure that Honeywell TPE331 engine customers benefit from faster turnaround times and improved efficiency at RUAG Aviation.

18/04/2017AERODYNAMICS EXPERTISE BY RUAG HELPING TO SHAPE A GREENER FUTURE FOR AVIATION

The ESICAPIA and LOSITA consortia, with RUAG Aviation as a member, have successfully developed and tested wind tunnel models for simulating emerging turbofan and propeller technologies.

13/03/2017RUAG RECEIVES EASA STC FOR THE GARMIN GTN 750 COCKPIT SOLUTION ON THE AVANTI

The European Aviation Safety Agency (EASA) has issued RUAG Aviation with a Supplemental Type Certificate (STC) for the installation of the Garmin GTN 750 advanced touchscreen solution in Piaggio P180 Avanti cockpits.

Syndicate content